# Evidence: Block 6 · Service (block-6)

- block type: block
- date: 2026-10-23
- resulting state: closed/verified
- story points (combined assembled cost): 2236
- execution id: 20261023.211318.384Z-a94affec

## Stories built
- Provide the complete POSIX automated test runner. (verification) [story]

## Stacked context
- stack: python_compact.md (SP 601)
- compass: COMPASS.md (SP 551)
- implements: FEATURE-VERIFICATION.md (SP 477)
- context: full_test.sh (SP 270)
- context: ARCHITECTURE_compact.md (SP 129)
- context: DATABASE_compact.md (SP 120)

## Build directory changes
- bin/test.sh
- data/app.db
- tests/test_verification_runner.py

## Pre-build acceptance observation
- GREEN (prepassed): verification-runner-present (FEATURE-VERIFICATION.md)
  intent: The delivered application provides an executable test runner at the required path.
  return code: 0
- GREEN (prepassed): verification-full-suite (FEATURE-VERIFICATION.md)
  intent: The complete staged release harness runs the delivered test runner successfully.
  return code: 0
  stdout:
    .............                                                            [100%]

## Post-build programmatic acceptance
- PASS: verification-runner-present (FEATURE-VERIFICATION.md)
  intent: The delivered application provides an executable test runner at the required path.
  target interpreter: /mnt/c/Users/barlo/projects/drydock/.venv/bin/python
  provisioning: not required
  return code: 0
- PASS: verification-full-suite (FEATURE-VERIFICATION.md)
  intent: The complete staged release harness runs the delivered test runner successfully.
  target interpreter: /mnt/c/Users/barlo/projects/drydock/.venv/bin/python
  provisioning: not required
  return code: 0
  stdout:
    ..................                                                       [100%]

## Build summary
RESULT: SUCCESS

FILES CHANGED:
- bin/test.sh
- tests/test_verification_runner.py

SUMMARY:
Updated the POSIX runner and added focused workflow tests. Full suite passed: 18 tests.

BLOCKERS:
- None
